Las Vegas, NV · EV charging infrastructure · Design–build
The hard part isn't the charger.
It's the power behind it.
Chargtek surveys, designs, permits and builds DC fast-charging sites — utility service, switchgear, conduit, foundations, dispensers and commissioning. We keep the trench short with horizontal directional drilling, and we size the ground for the power levels arriving now, not the ones that shipped in 2019.
Overnight · workplace
Being retired
Volume tier
Highway standard
10–70% in ~5 min
Class 8 · transit
- 3,750 kWMegawatt Charging System ceiling — Class 8, transit, marine
- 1,000 kW1,000 V architectures — 10–70% in about five minutes
- 350 kWHigh power — current highway standard
- 150 kWDC fast — today's volume tier
- 50 kWLegacy DC — being retired from public networks
- 7.2 kWLevel 2 AC — overnight, workplace, multifamily
What we build
Four site types. One power problem.
Every project comes down to the same question — how much power can this ground carry, and what will it need to carry in seven years. We answer that first, then build backwards from it.
Site type 01
Highway fast-charge plazas
150–400 kW pull-through bays, canopy and lighting, ADA access routes, and switchgear pads sized for a second phase you haven't ordered yet.
Bay configs & timelines →
Site type 02
Fleet & depot charging
Transit, school bus, last-mile and Class 8 yards. Sequenced charging so you buy service capacity once, plus pathways reserved for megawatt dispensers.
Bay configs & timelines →
Site type 03
Commercial & destination
Retail, hospitality, multifamily and parking structures. Level 2 arrays with a DC anchor, metered for revenue, wired so adding ports later doesn't mean re-trenching.
Bay configs & timelines →
Site type 04
OEM & dealer networks
Delivery centers, dealer service bays and brand-standard public sites. Repeatable multi-site rollout to a single spec, one point of contact per market.
Bay configs & timelines →
The power path
Six steps from dirt to dispenser.
This is a sequence, not a menu. Skipping the front end is what turns a nine-month project into a two-year one — almost always at the utility interconnection.
01
Survey & evaluate
Our team walks your location at no cost. Utility capacity, service entrance options, transformer distance, soils, ADA path of travel — and what the site can realistically support today.
02
Plan & design
One-line diagrams, load calculations, civil and foundation design, and stub-ups sized for the next generation of cabinets — not just the ones on this purchase order.
03
Permit & approval
We work directly with cities and utilities — AHJ submittal, make-ready applications, and the interconnection request that gates your whole schedule.
04
Install & validate
Directional drilling keeps your lot open and your surface intact. Concrete, conduit, switchgear, dispensers — then commissioning and acceptance testing before handover.
05
Monitor & metrics
24/7 network insight through your OCPP back end. Uptime, session counts, energy dispensed, fault codes and the reporting any funding program will ask for.
06
Maintain & upgrade
Preventive maintenance, cable and dispenser replacement, and power-cabinet upgrades. When your site needs to go from 150 kW to 400 kW, the pathway is already in the ground.
Free tool
Can your site support fast charging?
Service size in, verdict out — with the arithmetic shown line by line. Two minutes, no signup.
Capability
Self-perform, end to end.
OEM programs
Entering the North American market?
Vehicles arrive before infrastructure does. If you are launching a brand or electrifying a commercial line in the United States, the charging build is a construction problem long before it is a hardware problem — and it runs on utility timelines, not product timelines.
- Delivery & dealer networks. Repeatable multi-site builds to one spec, market by market.
- 1,000 V ready. Conductor, clearance and pad design that accepts megawatt-class cabinets without a second mobilization.
- Dual-standard dispensing. NACS and CCS1 served from the same bay through the transition.
- Utility interface. We run make-ready and interconnection — the item that actually sets your launch date.
Commonly asked
You've got questions.
How do I get power to my location?
Can my current location support a fast charger?
How many chargers should I install?
What does horizontal directional drilling change?
Do you build for heavy-duty and transit fleets?
Next step