Vehicles arrive before
infrastructure does.
If you are entering the North American market — launching a brand, standing up delivery centers, or electrifying a commercial vehicle line — the charging build is a construction problem long before it is a hardware problem. And it runs on utility timelines, not product timelines. That gap is what we close.
The problem we solve
Your launch date is set by a utility queue.
A vehicle program can compress almost everything — except the interconnection request sitting in a utility's work plan. The OEMs that hit their dates are the ones whose construction partner filed early, filed correctly, and tracked the queue weekly in every market at once. That is the job.
Program element 01
One spec, every market
Your brand standard and charging architecture, executed identically in each metro — delivery centers, dealer service bays, brand-standard public sites. A kit-of-parts per location class, so site #14 costs less and opens faster than site #4.
Program element 02
Utility interface, run for you
We file make-ready applications and interconnection requests in parallel across markets, and report queue position weekly. The single number an OEM program office actually needs: days to power, per site.
Program element 03
1,000 V fluency
We don't need to be taught what a 1,000 V platform requires. Conductor, clearance and pad design that accepts megawatt-class cabinets without a second mobilization — and dual-standard NACS + CCS1 dispensing through the transition.
Why a construction partner, not a charging vendor
Catalog-neutral, by design.
Charging networks sell you their hardware and their footprint. Chargtek builds to your architecture on your real estate — we are not tied to a manufacturer's catalog, and your brand standard is the spec, not a customization request.
One contractor, one weekly report, one point of accountability per market. Survey through commissioning through maintenance — the six-step sequence on How we build, repeated per site, rolled up per program.
- Delivery & dealer networks. Repeatable multi-site builds to one spec, market by market, with a single point of accountability.
- Plant, depot & port charging. Bus, truck and yard-equipment charging, sequenced for shift patterns and staged for MCS.
- 1,000 V ready. Pads and pathways that accept megawatt-class cabinets without re-mobilizing.
- Dual-standard dispensing. NACS and CCS1 served from the same bay through the transition period.
- Utility interface. Make-ready and interconnection run by us — the item that actually sets your launch date.
- Directional drilling in-house. Existing pavement, active lots and live campuses stay open while we get power across them.
How a program starts
Pilot site first. Then the map.
Phase 1
Pilot build
One site, your spec, full six-step sequence. You see the survey quality, the weekly reporting, the commissioning documentation — and we both calibrate the kit-of-parts before it multiplies.
Phase 2
Market rollout
Sites sequenced against your vehicle launch calendar, utility filings running in parallel across every market so no single queue holds the program hostage.
Phase 3
Operate & scale
Monitoring on your OCPP back end, maintenance with defined response times, and upgrade paths already in the ground as your vehicle platforms move up the power curve.
A note on independence: Chargtek is an independent contractor. We have no exclusive hardware relationships and represent no charging network — which is exactly what makes us the right partner for a manufacturer that has its own standard to build to.